Trustur AI
Sign in →
Done for you in 5 minutes.
A comprehensive project schedule and step-by-step installation methodology for your glazing and aluminium contracting project. Walk away with a professional document ready to submit to main contractors or clients.
5 minutes · Get one month for $19.99 · Already have an account? Sign in ›
Getting your glass and aluminium installation work program approved is the key to unlocking commercial sites and keeping main contractors happy. This document is your step-by-step game plan, combining a realistic project schedule with a clear installation methodology. You need this when tendering for high-value contracts, submitting pre-start documentation to principal contractors, or coordinating your crew on-site. A great work program doesn't just list dates; it proves you understand the physical flow of the build. It details how you will handle material storage safely, manage crane lifts for heavy glazing, align frame installations with structural openings, and coordinate with waterproofing trades. When done right, it establishes your reputation as a professional subcontractor who prevents delays rather than causing them, ensuring you get paid on time and invited back for the next project.
A work program is a time-based schedule showing when tasks occur, while a method statement explains step-by-step how the installation will be done safely and correctly. Main contractors usually require both documents integrated into one package before allowing your team on site.
You must separate the frame installation and glazing phases, leaving a clear buffer of at least two to four weeks for glass fabrication after final site measurements are taken. Never schedule glass delivery for the same day as frame erection, as structural openings frequently deviate from architectural drawings.
Yes, including a field water test in your methodology demonstrates professional accountability and quality control. Documenting this step protects your business from liability regarding pre-existing structural leaks or issues caused by other trades.
Your program must explicitly state that structural openings must be signed off and handed over within specific millimeter tolerances before your installation window begins. By clearly defining these pre-conditions, you establish a solid contractual basis to claim an extension of time if the main contractor's prep work is delayed.
Start this skill and Trustur handles the rest, start to finish.
Start this skill